Lighting and ceiling tile grid work proceeds at Trinity this week. The grids are up in the first floor gym lobby, classrooms, and hallways. New LED lights have been in installed in the lobby and halls.

All the block walls are down in the fire source rooms. The last of the dry ice blasting and final smoke cleaning are underway.